Coils for education facilities.
Custom commercial coils for the spaces where students learn and campuses come together. Made to order for replacement, retrofit, and new applications.

Explore your facility.
Universities — Selected
Universities
A campus brings together busy classrooms, research spaces, and the equipment working behind the scenes. Whether you’re replacing one coil or coordinating work across several buildings, we can help you work through what each space needs.
Teaching spaces
From a morning lecture to an evening class, teaching spaces serve different groups throughout the day. When a coil needs replacing, the equipment, fit, and timing all matter. We can help you work through the details for an existing unit or review the requirements for a new application.

Research environments
Research spaces can have needs that differ from the rest of campus, including specific temperature, humidity, or ventilation requirements. Whether you have a detailed specification or are starting with an existing coil, share what you know. We can help clarify which details matter for your application.

Building operations
Replacing a coil often means working with equipment that is already in place. Dimensions, connection locations, and available space help establish what will fit. Start with the measurements, photos, or drawings you have, and we can help identify anything else needed to move the replacement forward.

Built with quality in mind.
Good quality starts with attention to the details. From material selection to manufacturing processes, the focus is on coils built to your approved specifications—for the classrooms, research spaces, and facilities your campus depends on.
Manufacturing certifications and product conformity.
Start with what you have.
Follow our measurement guides, enter measurements you already have, or upload drawings or specifications. You can add photos to help explain the details.

Help me measure my coil
Interactive guides, one measurement at a time

I already have my measurements
Enter everything on one measurement sheet

I have drawings or specifications
Upload your documents for engineering review
Production lead times
- Microchannel coils
- 15–21 calendar days
- All other coils
- 12–15 calendar days
After drawing approval. Shipping time is additional.
Need coils for your campus?
Tell us what you’re working on. We’ll help you with the next step.




